Signed Change Order Example
This document provides a detailed explanation of the payload structure for a POST request to the "/" endpoint. The payload consists of various fields representing different entities such as company, customer, office, epc_market, formattedFields, solarData, additional data. Each section below details the purpose and structure of the fields.
| Value Name | Description | Value Type |
|---|---|---|
id | Enerflo install ID | integer |
status | The status of the installation ("complete", etc.). | string |
install | Contains detailed information about the installation. Here is a detailed breakdown of the install object and its fields. | object |
surveyData | Contains detailed information about the installation. Here is a detailed breakdown of the surveyData object and its fields. | object |
driveFolders | Folder structure in the associated Google Drive for the project. | object |
installAgreement | Contains details about the installation agreement. Here is a detailed breakdown of the installAgreement object and its fields. | object |
current_milestone | Contains details about the current project milestone. Here is a detailed breakdown of the current_milestone object and its fields. | object |
all_milestones | An array containing all milestones related to the project, each with specific details. | array |
customer | An object containing comprehensive information about a customer, including personal details, contact information, and various associated metadata. Here is a detailed description of each key-value pair within the object. | object |
change_orders | An Array containing detailed information about all the change orders for the install. Here is a detailed breakdown of the change_orders array. | array |
company | An object containing information about the company associated with the event or project.Here is a detailed description of each key-value pair within the object. | object |
agent | An object containing detailed information about the agent associated with the event. Here is a detailed description of each key-value pair within the object. | object |
milestones | A list containing information about the milestones associated with the install. | array |
signer | Contains information about the individual who signed the change order. | object |
co_signer | Co-signer information (if applicable). | array |
notes | Any additional notes related to the change order. | string |
change_values | Contains the before and after states for values that were updated during the change order | object |
created_at | Timestamp when the change order was created. | string |
updated_at | Timestamp when the change order was last updated. | string |
signed_at | Timestamp when the change order was signed. | string |
pdf_url | URL to the signed PDF document. | string |
eventName | Name of the event, in this case, "signed_change_order". | string |
"body": {
"id": 0123456,
"status": "complete",
"install": {
"id": 6543210,
"epc_company_id": 0000,
"company_id": 0000,
"editor_company_id": 0000,
"office_id": null,
"epc_market_id": 0000000,
"customer_id": 01234567,
"survey_type_id": 0000,
"survey_id": 000000,
"site_survey_id": null,
"agent_id": 00000,
"agreement_id": 00000,
"created_at": "2024-08-07 23:59:41",
"updated_at": "2024-09-16 18:40:42",
"deleted_at": null,
"status_id": 4,
"agreement_url": "https://assets.enerflo.io/docflo_pdfs/executed/Testing.pdf",
"survey_url": "https://enerflo.io/survey/menu/0000",
"proposal_url": "https://enerflo.io/surveyreport/show/company/00000",
"office": null,
"epc_market": {
"id": 00000,
"epc_company_id": 0000,
"created_at": "2023-06-16 20:27:12",
"updated_at": "2023-06-16 20:27:12",
"market_name": "Utah",
"market_address": null,
"market_city": null,
"market_state": null,
"market_zip": null,
"timezone": "America/Denver",
"crm_id": null,
"disable_inherit": 0,
"second_look": 0,
"lng": null,
"lat": null
},
"formattedFields": [],
"solarData": {
"system_size": 3.6,
"offset": 46.3,
"panel_count": 10,
"panel": {
"id": 0000,
"company_id": 0000,
"name": "Enphase: Q.PEAK DUO BLK-G10 + 360",
"model": "Q.PEAK DUO BLK-G10 + 360",
"manufacturer": "Enphase",
"width": 1045,
"length": 1879,
"watts": 360,
"meta_data": null,
"solar_degradation": 0.005,
"spec_sheet_url": null,
"created_at": "2024-03-20 20:05:05",
"updated_at": "2024-03-20 20:05:05",
"all_offices": 1,
"all_markets": 1,
"all_dealers": 0,
"all_lenders": 1,
"active": 1,
"price_adder": null,
"crm_id": null,
"price_cost": null
},
"inverter": {
"id": 0000
"company_id": 0000,
"name": "Sol-Ark: Sol-Ark-12K-P",
"model": "Sol-Ark-12K-P",
"manufacturer": "Sol-Ark",
"meta_data": null,
"max_efficiency": 0.96,
"created_at": "2024-03-20 20:05:05",
"updated_at": "2024-03-20 20:05:05",
"is_microinverter": 0,
"all_offices": 1,
"all_markets": 1,
"all_dealers": 0,
"all_lenders": 1,
"active": 1,
"price_adder": null,
"fixed_cost": "0.00",
"crm_id": null
},
"inveter_count": 1,
"inverter_count": 1,
"system_production": 5272,
"system_cost": 10800,
"system_adder_cost": 39150,
"total_system_cost": 49950,
"total_loan_cost": 49950,
"total_net_loan_cost": 19980,
"total_cash_cost": 10800,
"ppw": 13.88,
"ppw_net": 5.55,
"ppw_base_start": 3,
"fed_tax_rebate": 14985,
"rebates": [],
"net_cost": 19980,
"finance_method": "Cash",
"finance_id": 0000,
"finance_code": "Cash_0yr_0",
"finance_details": {
"apr": 0,
"term": 0,
"balance": 49950,
"termYears": 0,
"totalinterest": -49950,
"monthlypayment": 0,
"monthlypaymentInitial": 0,
"monthlypaymentAdjusted": 0,
"monthlypaymentEscalated": 0
},
"dealer_fee_percent": 0,
"dealer_fee_amount": 0,
"finance_ppw": 5.55,
"panel_type": false,
"enerflo_install_id": 000000,
"down_payment": null,
"adders": {
"Small System Adder (under 5kW)": {
"id": 0000,
"qty": 1,
"cost": 500,
"name": "Small System Adder (under 5kW)",
"type": "SYSTEM",
"active": 1,
"base_cost": 500,
"company_cost": 0,
"offset_value": 0,
"single_price": 500,
"costAfterFees": 500,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Concierge Fee": {
"id": 0000,
"qty": 1,
"cost": 100,
"name": "Concierge Fee",
"type": "VALUE",
"active": 1,
"base_cost": 100,
"company_cost": 0,
"offset_value": 0,
"single_price": 100,
"costAfterFees": 100,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"EV Charger ": {
"id": 0000,
"qty": 1,
"cost": 2500,
"name": "EV Charger ",
"type": "VALUE",
"active": 1,
"base_cost": 2500,
"company_cost": 0,
"offset_value": 0,
"single_price": 2500,
"costAfterFees": 2500,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Travel Adder": {
"id": 0000,
"qty": 1,
"cost": 360,
"name": "Travel Adder",
"type": "VALUE",
"active": 1,
"base_cost": 360,
"company_cost": 0,
"offset_value": 0,
"single_price": 360,
"costAfterFees": 360,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Storage Packages 15kw ": {
"id": 0000,
"qty": 1,
"cost": 25000,
"name": "Storage Packages 15kw ",
"type": "VALUE",
"active": 1,
"base_cost": 25000,
"company_cost": 0,
"offset_value": 0,
"single_price": 25000,
"costAfterFees": 25000,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Margin ": {
"id": 0000,
"qty": 1,
"cost": 150,
"name": "Margin ",
"type": "VALUE",
"active": 1,
"base_cost": 150,
"company_cost": 0,
"offset_value": 0,
"single_price": 150,
"costAfterFees": 150,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"MPU": {
"id": 0000,
"qty": 1,
"cost": 10000,
"name": "MPU",
"type": "VALUE",
"active": 1,
"base_cost": 10000,
"company_cost": 0,
"offset_value": 0,
"single_price": 10000,
"costAfterFees": 10000,
"contract_hide_adder": null,
"contract_show_adder_price": null
}
},
"discounts": 0,
"travel_adder": {
"ppw": 0,
"cost": 0
},
"allAdders": {
"valueAdders": [
{
"id": 0000,
"qty": 1,
"cost": 500,
"name": "Small System Adder (under 5kW)",
"type": "SYSTEM",
"active": 1,
"base_cost": 500,
"company_cost": 0,
"offset_value": 0,
"single_price": 500,
"costAfterFees": 500,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
{
"id": 0000,
"qty": 1,
"cost": 100,
"name": "Concierge Fee",
"type": "VALUE",
"active": 1,
"base_cost": 100,
"company_cost": 0,
"offset_value": 0,
"single_price": 100,
"costAfterFees": 100,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
{
"id": 0000,
"qty": 1,
"cost": 2500,
"name": "EV Charger ",
"type": "VALUE",
"active": 1,
"base_cost": 2500,
"company_cost": 0,
"offset_value": 0,
"single_price": 2500,
"costAfterFees": 2500,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
{
"id": 0000,
"qty": 1,
"cost": 360,
"name": "Travel Adder",
"type": "VALUE",
"active": 1,
"base_cost": 360,
"company_cost": 0,
"offset_value": 0,
"single_price": 360,
"costAfterFees": 360,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
{
"id": 0000,
"qty": 1,
"cost": 25000,
"name": "Storage Packages 15kw ",
"type": "VALUE",
"active": 1,
"base_cost": 25000,
"company_cost": 0,
"offset_value": 0,
"single_price": 25000,
"costAfterFees": 25000,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
{
"id": 0000,
"qty": 1,
"cost": 150,
"name": "Margin ",
"type": "VALUE",
"active": 1,
"base_cost": 150,
"company_cost": 0,
"offset_value": 0,
"single_price": 150,
"costAfterFees": 150,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
{
"id": 0000,
"qty": 1,
"cost": 10000,
"name": "MPU",
"type": "VALUE",
"active": 1,
"base_cost": 10000,
"company_cost": 0,
"offset_value": 0,
"single_price": 10000,
"costAfterFees": 10000,
"contract_hide_adder": null,
"contract_show_adder_price": null
}
],
"valueAddersList": [
"Small System Adder (under 5kW)",
"Concierge Fee",
"EV Charger ",
"Travel Adder",
"Storage Packages 15kw ",
"Margin ",
"MPU"
],
"valueAddersCost": 38610,
"valueAddersCostList": [
500,
100,
2500,
360,
25000,
150,
10000
],
"valueAddersCostAfterFeesList": [
500,
100,
2500,
360,
25000,
150,
10000
],
"systemAdders": [],
"systemAddersList": [],
"systemAddersCost": 0,
"systemAddersCostList": [],
"soloAdders": null,
"soloAddersList": [],
"soloNamesAddersList": [],
"soloAddersCost": 0,
"customAdders": [],
"customAddersList": [],
"customAddersCost": 0,
"equipmentAdders": [],
"equipmentAddersList": [],
"panelAdderPpw": null,
"inverterAdderPpw": 0,
"inverterAdderFixedCost": "0.00",
"equipmentAddersCost": 0,
"batteryAdders": [],
"batteryNames": "",
"batteryQty": 0,
"batteryCost": 0,
"batteryCostAfterFees": 0
},
"allAddersList": "Small System Adder (under 5kW), Concierge Fee, EV Charger , Travel Adder, Storage Packages 15kw , Margin , MPU",
"allAddersCost": 38610,
"allAddersCostList": "500, 100, 2500, 360, 25000, 150, 10000",
"needs_mpu": "no",
"needs_roof": "no",
"adders_list": ""
},
"integrations": [],
"surveyData": {
"id": 123456,
"customer_id": 1234567,
"company_id": 0000,
"epc_company_id": 0000,
"survey_type_id": 1324,
"survey_type_name": "Enerflo Test Solar - Optimus V2 Deal",
"survey_hash": "123abc-b1d5-4302-a55e-7c191ea0258e",
"agent_name": "Enerflo Admin",
"agent_email": "[email protected]",
"integrations": {
"Enerflo V2": {
"EnerfloV2Deal": {
"integration_record_id": "123456abc-ccde-4a82-8305-bdf95e12189f",
"record_type": "EnerfloV2Deal",
"enerflo_id": 00123,
"last_synced": "2024-08-08T00:47:34+00:00",
"updated_at": "2024-08-08T00:47:34+00:00",
"created_at": "2024-08-07T21:57:31+00:00"
}
}
},
"installDetails": {
"id": 0123465,
"epc_company_id": 0000,
"company_id": 0000,
"editor_company_id": 0000,
"office_id": null,
"epc_market_id": 654321,
"customer_id": 123456,
"survey_type_id": 0000,
"survey_id": 0123456,
"site_survey_id": null,
"agent_id": 0000,
"agreement_id": 00000,
"created_at": "2024-08-07 23:59:41",
"updated_at": "2024-09-16 18:40:42",
"deleted_at": null,
"status_id": 4
},
"last_updated_section_id": null,
"completed_by_name": "",
"completed_by_email": "",
"user_completed_by_id": null,
"user_completed_by_name": "",
"user_completed_by_email": "",
"last_updated_by_id": null,
"last_updated_by_name": "",
"last_updated_by_email": "",
"created_at": "2024-08-07T21:57:31+00:00",
"updated_at": "2024-08-08T00:47:34+00:00",
"utility": {
"utility_id": 001,
"utility_name": "Enerflo Power",
"utility_short_name": "Enerflo Power",
"tags": [],
"company_alias": null,
"crm_id": null
},
"external_customer_id": null,
"survey_data": {
"panel_id": 0000,
"utility_id": 001,
"inverter_id": 0000,
"lender_picker": 00000,
"solar_system_size": 3.6,
"solar_design_notes": "",
"solar_data_panel_count": 10,
"solar_data_solar_offset": 46.26646690610002,
"solar_data_current_usage": 11394.382968000002,
"solar_data_inverter_count": 1,
"solar_data_system_production": 5271.778425044018,
"solar_data_total_cost_after_fees": 49950,
"solar_proposal_monthly_power_bill": 103.32,
"pricingOutputs": {
"deal": {
"org": {
"id": "abc321-07a6-414f-97fe-0a918d6e2d08"
},
"state": {
"hasDesign": true,
"credit-score": "above-680",
"financingStatus": "approved",
"financing-warning": true,
"hasApprovedDesign": true,
"hasReceivedDesign": true,
"hasCreatedProposal": true,
"hasSignedFinancingDocs": true,
"hasSubmittedFinancingApplication": true,
"all-decision-makers-present-at-time-of-appointment": true
},
"installer": {
"id": "987cba-07a6-414f-97fe-0a918d6e2d08"
},
"projectAddress": {
"lat": 39.11932640387794,
"lng": -111.8209463656414,
"city": "Centerfield",
"line1": "123 main Street",
"line2": null,
"line3": null,
"state": "UT",
"country": "US",
"postalCode": 84622,
"fullAddress": "123 main Street, Centerfield, UT, 84622"
}
},
"design": {
"arrays": [
{
"name": "Array 1",
"tsrf": null,
"pitch": 10,
"module": {
"id": "987456-f42f-4fd9-acde-123456abcd",
"name": "Enphase: Q.PEAK DUO BLK-G10 + 360",
"model": "Q.PEAK DUO BLK-G10 + 360",
"width": 1045,
"length": 1879,
"capacity": 360,
"efficiency": 0.201,
"degradation": 0.005,
"manufacturer": "Enphase"
},
"azimuth": 180,
"production": 5271.778425044018,
"moduleCount": 10,
"inverterIndex": 0
}
],
"offset": 0.46266466906100023,
"source": {
"tool": "SELF_SUBMITTED"
},
"battery": [],
"utility": {
"id": "654321abc-dd5e-4868-b91c-7cf7365ac688",
"name": "Enerflo Power",
"genabilityId": 626
},
"batteries": [],
"inverters": [
{
"id": "abc456-39ba-4d20-87cb-542a5b8c445e",
"name": "Sol-Ark: Sol-Ark-12K-P",
"model": "Sol-Ark-12K-P",
"isMicro": false,
"acOutput": 12000,
"efficiency": 0.965,
"manufacturer": "Sol-Ark"
}
],
"batteryCount": 0,
"mountingType": "ROOF",
"roofMaterial": "ASPHALT_SHINGLES",
"inverterCount": 1,
"consumptionProfile": {
"id": "789jkl-d186-45ff-8099-dd000asd",
"rate": 0.098,
"title": "Default Consumption Profile",
"tariff": {
"lseId": 626,
"tariffId": 0123456,
"tariffName": "Residential",
"effectiveDate": "2024-03-01",
"masterTariffId": 0987654
},
"utility": {
"id": "adbc789456-dd5e-4868-b91c-7cf7365ac688",
"name": "Enerflo Power",
"genabilityId": 626
},
"annualBill": 1239.83390419,
"consumption": [
980.638197,
895.249033,
904.754941,
842.791719,
868.715303,
951.927628,
1158.026864,
1094.618588,
902.473886,
893.625827,
916.945683,
984.615299
],
"buildingArea": 1981,
"postSolarRate": 0.0981109646155962,
"postSolarTariff": {
"lseId": 626,
"tariffId": 0123456,
"tariffName": "Residential",
"effectiveDate": "2024-03-01",
"masterTariffId": 987654
},
"postSolarUtility": null,
"annualConsumption": 11394.382968000002,
"averageMonthlyBill": 103.32,
"averageUtilityRate": 0.098,
"averageMonthlyConsumption": 949.53
},
"firstYearProduction": 5271.778425044018,
"totalSystemSizeWatts": 3600,
"cumulativeSystemSizeWatts": 3600
},
"netPPW": 9.71,
"basePPW": 3,
"netCost": 34965,
"rebates": [
{
"id": "123456-f3e9-4c97-a4c5-dcf0b02a526b",
"uniqueKey": "123456-f3e9-4c97-a4c5-dcf0b02a526b",
"displayName": "Federal Tax Credit",
"pricingOption": {
"id": "987654-0b42-42a6-97e3-afadd0720906",
"name": "Pricing Option",
"type": "FEDERAL_ITC",
"model": [],
"inputs": {
"type": "federal",
"amount": 0,
"itcPercent": 0.3,
"pricingOptionId": "987654-0b42-42a6-97e3-afadd0720906",
"pricingOptionName": "Pricing Option"
}
},
"priceableEntityName": "Rebate"
}
],
"taxRate": 0,
"baseCost": 10800,
"grossPPW": 13.88,
"dealerFee": 0,
"discounts": [],
"grossCost": 49950,
"salesTeams": [],
"downPayment": 0,
"financeCost": 49950,
"moduleTotal": 540,
"adderPricing": {
"valueAdders": [
{
"id": "0123456-b40c-4ef6-9cbc-45a781db7cef",
"name": "Concierge Fee",
"orgId": "0f86f737-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-b40c-4ef6-9cbc-45a781db7cef",
"displayName": "Concierge Fee",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-09ef-4e43-aa62-27a35916fb8e",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 100,
"pricingOptionId": "0123456-09ef-4e43-aa62-27a35916fb8e",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-3650-4429-bac3-41ab619d6fc6",
"name": "EV Charger ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-3650-4429-bac3-41ab619d6fc6",
"displayName": "EV Charger ",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 2500,
"pricingOptionId": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"name": "Travel Adder",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"displayName": "Travel Adder",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-eee4-4b21-959e-a9055f4e6368",
"name": "Pricing Option",
"type": "PPW",
"model": {
"amount": {
"inputs": [
"systemSizeWatts",
"ppw"
]
}
},
"inputs": {
"ppw": 0.1,
"pricingOptionId": "0123456-eee4-4b21-959e-a9055f4e6368",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-f398-4f5b-a749-f3157eaefcd8",
"name": "Storage Packages 15kw ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-f398-4f5b-a749-f3157eaefcd8",
"displayName": "Storage Packages 15kw ",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-8dca-44fd-9f20-c0688d989683",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 25000,
"pricingOptionId": "0123456-8dca-44fd-9f20-c0688d989683",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-a5ae-4862-9585-c9349ba563f7",
"name": "Margin ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-a5ae-4862-9585-c9349ba563f7",
"displayName": "Margin ",
"dynamicInputs": [
{
"name": "what-is-the-margin-cost",
"type": "NumberField",
"settings": {
"label": "What is the margin cost?",
"isRequired": true
}
}
],
"pricingOptions": [
{
"id": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"name": "Pricing Option",
"type": "CUSTOM",
"model": {
"amount": {
"inputs": [
"fieldInputs.what-is-the-margin-cost"
]
}
},
"inputs": {
"fieldInputs": {
"what-is-the-margin-cost": 150
},
"pricingOptionId": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-573c-406c-8070-aec4f63f989b",
"name": "MPU",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-573c-406c-8070-aec4f63f989b",
"displayName": "MPU",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-98d9-4126-8996-3dd0f5a99d30",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 10000,
"pricingOptionId": "0123456-98d9-4126-8996-3dd0f5a99d30",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
}
],
"systemAdders": [
{
"id": "0123456-e8c8-4b5e-876c-b3dcff7f606e",
"name": "Small System Adder (under 5kW)",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-e8c8-4b5e-876c-b3dcff7f606e",
"displayName": "Small System Adder (under 5kW)",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-c8a0-4daa-802c-f3ed0b6c3b78",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 500,
"pricingOptionId": "0123456-c8a0-4daa-802c-f3ed0b6c3b78",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
}
],
"skippedAdders": [],
"availableValueAdders": [
{
"id": "0123456-3650-4429-bac3-41ab619d6fc6",
"name": "EV Charger ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-3650-4429-bac3-41ab619d6fc6",
"displayName": "EV Charger ",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 2500,
"pricingOptionId": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"name": "Travel Adder",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"displayName": "Travel Adder",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-eee4-4b21-959e-a9055f4e6368",
"name": "Pricing Option",
"type": "PPW",
"model": {
"amount": {
"inputs": [
"systemSizeWatts",
"ppw"
]
}
},
"inputs": {
"ppw": 0.1,
"pricingOptionId": "0123456-eee4-4b21-959e-a9055f4e6368",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-f398-4f5b-a749-f3157eaefcd8",
"name": "Storage Packages 15kw ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-f398-4f5b-a749-f3157eaefcd8",
"displayName": "Storage Packages 15kw ",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-8dca-44fd-9f20-c0688d989683",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 25000,
"pricingOptionId": "0123456-8dca-44fd-9f20-c0688d989683",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-a5ae-4862-9585-c9349ba563f7",
"name": "Margin ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-a5ae-4862-9585-c9349ba563f7",
"displayName": "Margin ",
"dynamicInputs": [
{
"name": "what-is-the-margin-cost",
"type": "NumberField",
"settings": {
"label": "What is the margin cost?",
"isRequired": true
}
}
],
"pricingOptions": [
{
"id": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"name": "Pricing Option",
"type": "CUSTOM",
"model": {
"amount": {
"inputs": [
"fieldInputs.what-is-the-margin-cost"
]
}
},
"inputs": {
"fieldInputs": {
"what-is-the-margin-cost": 150
},
"pricingOptionId": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-573c-406c-8070-aec4f63f989b",
"name": "MPU",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"uniqueKey": "0123456-573c-406c-8070-aec4f63f989b",
"displayName": "MPU",
"dynamicInputs": [],
"pricingOptions": [
{
"id": "0123456-98d9-4126-8996-3dd0f5a99d30",
"name": "Pricing Option",
"type": "FIXED_AMOUNT",
"model": [],
"inputs": {
"amount": 10000,
"pricingOptionId": "0123456-98d9-4126-8996-3dd0f5a99d30",
"pricingOptionName": "Pricing Option"
}
}
],
"priceableEntityName": "Adder",
"dynamicInputsSatisfied": true
}
]
},
"batteryTotal": 0,
"rebatesTotal": 14985,
"financeMethod": {
"id": "CashFinancePlugin",
"pluginName": "CashFinancePlugin"
},
"inverterTotal": 0,
"commissionBase": 49950,
"discountsTotal": 0,
"equipmentTotal": 540,
"financeProduct": {
"id": "0123456-acae-4042-87f1-7136651d5946",
"name": "One-time Cash Payment",
"plugin": "CashFinancePlugin",
"states": [],
"status": "ACTIVE",
"methodId": "CashFinancePlugin",
"createdAt": "2024-03-20T19:58:21.000Z",
"updatedAt": "2024-03-20T19:58:21.000Z",
"termMonths": 0,
"customFields": {
"states": {
"value": []
}
},
"originalName": "One-time Cash Payment",
"financeMethod": "CashFinancePlugin",
"dealerFeePercent": 0,
"financeMethodName": "Cash Finance",
"originalDealerFeePercent": 0
},
"withDealerFees": {
"basePPW": 3,
"baseCost": 10800,
"equipmentTotal": 540,
"valueAddersTotal": 38110,
"systemAddersTotal": 500,
"calculatedEquipment": [
{
"id": "0123456-f42f-4fd9-acde-10364f39ae76",
"pitch": 10,
"amount": 540,
"azimuth": 180,
"capacity": 360,
"tierStart": 0,
"uniqueKey": "0123456-f42f-4fd9-acde-10364f39ae76_0",
"displayName": "Array 1 - Enphase: Q.PEAK DUO BLK-G10 + 360 (x10)",
"moduleCount": 10,
"modulePrice": 0,
"pricingOptionId": "0123456-fc65-4cab-918d-d156a42ccbb5",
"pricingOptionName": "Pricing Option",
"priceableEntityName": "OrgEquipment.PV_MODULE",
"includeExistingSystem": false
},
{
"id": "0123456-39ba-4d20-87cb-542a5b8c445e",
"qty": 1,
"amount": 0,
"tierStart": 0,
"uniqueKey": "0123456-39ba-4d20-87cb-542a5b8c445e_0",
"displayName": "Sol-Ark: Sol-Ark-12K-P",
"pricingOptionId": "No-Op Pricing Option",
"pricingOptionName": "No-Op Pricing Option",
"priceableEntityName": "OrgEquipment.INVERTER"
}
],
"calculatedValueAdders": [
{
"id": "0123456-b40c-4ef6-9cbc-45a781db7cef",
"name": "Concierge Fee",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 100,
"uniqueKey": "0123456-b40c-4ef6-9cbc-45a781db7cef",
"displayName": "Concierge Fee",
"dynamicInputs": [],
"pricingOptionId": "0123456-09ef-4e43-aa62-27a35916fb8e",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-3650-4429-bac3-41ab619d6fc6",
"name": "EV Charger ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 2500,
"uniqueKey": "0123456-3650-4429-bac3-41ab619d6fc6",
"displayName": "EV Charger ",
"dynamicInputs": [],
"pricingOptionId": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"name": "Travel Adder",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 360,
"uniqueKey": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"displayName": "Travel Adder",
"dynamicInputs": [],
"pricingOptionId": "0123456-eee4-4b21-959e-a9055f4e6368",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-f398-4f5b-a749-f3157eaefcd8",
"name": "Storage Packages 15kw ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 25000,
"uniqueKey": "0123456-f398-4f5b-a749-f3157eaefcd8",
"displayName": "Storage Packages 15kw ",
"dynamicInputs": [],
"pricingOptionId": "0123456-8dca-44fd-9f20-c0688d989683",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-a5ae-4862-9585-c9349ba563f7",
"name": "Margin ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 150,
"uniqueKey": "0123456-a5ae-4862-9585-c9349ba563f7",
"displayName": "Margin ",
"fieldInputs": {
"what-is-the-margin-cost": 150
},
"dynamicInputs": [
{
"name": "what-is-the-margin-cost",
"type": "NumberField",
"settings": {
"label": "What is the margin cost?",
"isRequired": true
}
}
],
"pricingOptionId": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-573c-406c-8070-aec4f63f989b",
"name": "MPU",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 10000,
"uniqueKey": "0123456-573c-406c-8070-aec4f63f989b",
"displayName": "MPU",
"dynamicInputs": [],
"pricingOptionId": "0123456-98d9-4126-8996-3dd0f5a99d30",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
}
],
"calculatedSystemAdders": [
{
"id": "0123456-e8c8-4b5e-876c-b3dcff7f606e",
"name": "Small System Adder (under 5kW)",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 500,
"uniqueKey": "0123456-e8c8-4b5e-876c-b3dcff7f606e",
"displayName": "Small System Adder (under 5kW)",
"dynamicInputs": [],
"pricingOptionId": "0123456-c8a0-4daa-802c-f3ed0b6c3b78",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
}
],
"baseCostWithAddersAndEquipment": 49950,
"calculatedAvailableValueAdders": [
{
"id": "0123456-3650-4429-bac3-41ab619d6fc6",
"name": "EV Charger ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 2500,
"uniqueKey": "0123456-3650-4429-bac3-41ab619d6fc6",
"displayName": "EV Charger ",
"dynamicInputs": [],
"pricingOptionId": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"name": "Travel Adder",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 360,
"uniqueKey": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"displayName": "Travel Adder",
"dynamicInputs": [],
"pricingOptionId": "0123456-eee4-4b21-959e-a9055f4e6368",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-f398-4f5b-a749-f3157eaefcd8",
"name": "Storage Packages 15kw ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 25000,
"uniqueKey": "0123456-f398-4f5b-a749-f3157eaefcd8",
"displayName": "Storage Packages 15kw ",
"dynamicInputs": [],
"pricingOptionId": "0123456-8dca-44fd-9f20-c0688d989683",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-a5ae-4862-9585-c9349ba563f7",
"name": "Margin ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 150,
"uniqueKey": "0123456-a5ae-4862-9585-c9349ba563f7",
"displayName": "Margin ",
"fieldInputs": {
"what-is-the-margin-cost": 150
},
"dynamicInputs": [
{
"name": "what-is-the-margin-cost",
"type": "NumberField",
"settings": {
"label": "What is the margin cost?",
"isRequired": true
}
}
],
"pricingOptionId": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-573c-406c-8070-aec4f63f989b",
"name": "MPU",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 10000,
"uniqueKey": "0123456-573c-406c-8070-aec4f63f989b",
"displayName": "MPU",
"dynamicInputs": [],
"pricingOptionId": "0123456-98d9-4126-8996-3dd0f5a99d30",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
}
]
},
"calculatedTaxes": {
"totalTax": 0,
"baseCostTax": 0,
"priceableItems": {
"0123456-b40c-4ef6-9cbc-45a781db7cef": {
"tax": 0,
"costWithTax": 100
},
"0123456-3650-4429-bac3-41ab619d6fc6": {
"tax": 0,
"costWithTax": 2500
},
"0123456-259f-4f81-ab3b-6e83cb8a7c59": {
"tax": 0,
"costWithTax": 360
},
"0123456-e8c8-4b5e-876c-b3dcff7f606e": {
"tax": 0,
"costWithTax": 500
},
"0123456-f398-4f5b-a749-f3157eaefcd8": {
"tax": 0,
"costWithTax": 25000
},
"0123456-a5ae-4862-9585-c9349ba563f7": {
"tax": 0,
"costWithTax": 150
},
"0123456-573c-406c-8070-aec4f63f989b": {
"tax": 0,
"costWithTax": 10000
},
"0123456-39ba-4d20-87cb-542a5b8c445e_0": {
"tax": 0,
"costWithTax": 0
},
"0123456-f42f-4fd9-acde-10364f39ae76_0": {
"tax": 0,
"costWithTax": 540
}
},
"baseCostWithTax": 10800,
"baseCostWithAddersEquipmentAndTax": 49950
},
"dealerFeeFactor": 1,
"pricingSettings": {
"basePPW": 3,
"rounding": {
"mode": 1,
"scale": 2
},
"stateTaxes": [],
"dealerFeePercent": 0,
"basePPWAdjustments": []
},
"systemSizeWatts": 3600,
"dealerFeePercent": 0,
"equipmentPricing": {
"batteries": [],
"inverters": [
{
"id": "0123456-39ba-4d20-87cb-542a5b8c445e",
"uniqueKey": "0123456-39ba-4d20-87cb-542a5b8c445e_0",
"displayName": "Sol-Ark: Sol-Ark-12K-P",
"pricingOptions": [
{
"id": "No-Op Pricing Option",
"name": "No-Op Pricing Option",
"type": "CUSTOM",
"model": [],
"inputs": {
"qty": 1,
"amount": 0,
"tierStart": 0,
"pricingOptionId": "No-Op Pricing Option",
"pricingOptionName": "No-Op Pricing Option"
}
}
],
"priceableEntityName": "OrgEquipment.INVERTER"
}
],
"pvModules": [
{
"id": "0123456-f42f-4fd9-acde-10364f39ae76",
"uniqueKey": "0123456-f42f-4fd9-acde-10364f39ae76_0",
"displayName": "Array 1 - Enphase: Q.PEAK DUO BLK-G10 + 360 (x10)",
"pricingOptions": [
{
"id": "0123456-fc65-4cab-918d-d156a42ccbb5",
"name": "Pricing Option",
"type": "PPW_PV_MODULE_ARRAY",
"model": {
"amount": {
"inputs": [
"moduleCount",
"capacity",
"ppw"
]
}
},
"inputs": {
"ppw": 0.15,
"pitch": 10,
"azimuth": 180,
"capacity": 360,
"tierStart": 0,
"moduleCount": 10,
"modulePrice": 0,
"pricingOptionId": "0123456-fc65-4cab-918d-d156a42ccbb5",
"pricingOptionName": "Pricing Option",
"includeExistingSystem": false
}
}
],
"priceableEntityName": "OrgEquipment.PV_MODULE"
}
]
},
"valueAddersTotal": 38110,
"calculatedRebates": [],
"commissionBasePPW": 13.88,
"federalRebateBase": 49950,
"systemAddersTotal": 500,
"federalRebateTotal": 14985,
"availableAdderTaxes": {
"0123456-3650-4429-bac3-41ab619d6fc6": {
"tax": 0,
"costWithTax": 2500
},
"0123456-259f-4f81-ab3b-6e83cb8a7c59": {
"tax": 0,
"costWithTax": 360
},
"0123456-f398-4f5b-a749-f3157eaefcd8": {
"tax": 0,
"costWithTax": 25000
},
"0123456-a5ae-4862-9585-c9349ba563f7": {
"tax": 0,
"costWithTax": 150
},
"0123456-573c-406c-8070-aec4f63f989b": {
"tax": 0,
"costWithTax": 10000
}
},
"calculatedDiscounts": [],
"calculatedEquipment": [
{
"id": "0123456-f42f-4fd9-acde-10364f39ae76",
"ppw": 0.15,
"pitch": 10,
"amount": 540,
"azimuth": 180,
"capacity": 360,
"tierStart": 0,
"uniqueKey": "0123456-f42f-4fd9-acde-10364f39ae76_0",
"displayName": "Array 1 - Enphase: Q.PEAK DUO BLK-G10 + 360 (x10)",
"moduleCount": 10,
"modulePrice": 0,
"pricingOptionId": "0123456-fc65-4cab-918d-d156a42ccbb5",
"pricingOptionName": "Pricing Option",
"priceableEntityName": "OrgEquipment.PV_MODULE",
"includeExistingSystem": false
},
{
"id": "0123456-39ba-4d20-87cb-542a5b8c445e",
"qty": 1,
"amount": 0,
"tierStart": 0,
"uniqueKey": "0123456-39ba-4d20-87cb-542a5b8c445e_0",
"displayName": "Sol-Ark: Sol-Ark-12K-P",
"pricingOptionId": "No-Op Pricing Option",
"pricingOptionName": "No-Op Pricing Option",
"priceableEntityName": "OrgEquipment.INVERTER"
}
],
"calculatedValueAdders": [
{
"id": "0123456-b40c-4ef6-9cbc-45a781db7cef",
"name": "Concierge Fee",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 100,
"uniqueKey": "0123456-b40c-4ef6-9cbc-45a781db7cef",
"displayName": "Concierge Fee",
"dynamicInputs": [],
"pricingOptionId": "0123456-09ef-4e43-aa62-27a35916fb8e",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-3650-4429-bac3-41ab619d6fc6",
"name": "EV Charger ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 2500,
"uniqueKey": "0123456-3650-4429-bac3-41ab619d6fc6",
"displayName": "EV Charger ",
"dynamicInputs": [],
"pricingOptionId": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"ppw": 0.1,
"name": "Travel Adder",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 360,
"uniqueKey": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"displayName": "Travel Adder",
"dynamicInputs": [],
"pricingOptionId": "0123456-eee4-4b21-959e-a9055f4e6368",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-f398-4f5b-a749-f3157eaefcd8",
"name": "Storage Packages 15kw ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 25000,
"uniqueKey": "0123456-f398-4f5b-a749-f3157eaefcd8",
"displayName": "Storage Packages 15kw ",
"dynamicInputs": [],
"pricingOptionId": "0123456-8dca-44fd-9f20-c0688d989683",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-a5ae-4862-9585-c9349ba563f7",
"name": "Margin ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 150,
"uniqueKey": "0123456-a5ae-4862-9585-c9349ba563f7",
"displayName": "Margin ",
"fieldInputs": {
"what-is-the-margin-cost": 150
},
"dynamicInputs": [
{
"name": "what-is-the-margin-cost",
"type": "NumberField",
"settings": {
"label": "What is the margin cost?",
"isRequired": true
}
}
],
"pricingOptionId": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-573c-406c-8070-aec4f63f989b",
"name": "MPU",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 10000,
"uniqueKey": "0123456-573c-406c-8070-aec4f63f989b",
"displayName": "MPU",
"dynamicInputs": [],
"pricingOptionId": "0123456-98d9-4126-8996-3dd0f5a99d30",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
}
],
"calculatedSystemAdders": [
{
"id": "0123456-e8c8-4b5e-876c-b3dcff7f606e",
"name": "Small System Adder (under 5kW)",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 500,
"uniqueKey": "0123456-e8c8-4b5e-876c-b3dcff7f606e",
"displayName": "Small System Adder (under 5kW)",
"dynamicInputs": [],
"pricingOptionId": "0123456-c8a0-4daa-802c-f3ed0b6c3b78",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
}
],
"grossCostBeforeRebates": 49950,
"addersAndEquipmentTotal": 39150,
"grossCostBeforeRebatesPPW": 13.88,
"rebatesFinancePaydownTotal": 14985,
"rebatesReducingFederalTotal": 0,
"rebatesReducingNetCostTotal": 14985,
"rebatesReducingGrossCostTotal": 0,
"baseCostWithAddersAndEquipment": 49950,
"calculatedAvailableValueAdders": [
{
"id": "0123456-3650-4429-bac3-41ab619d6fc6",
"name": "EV Charger ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 2500,
"uniqueKey": "0123456-3650-4429-bac3-41ab619d6fc6",
"displayName": "EV Charger ",
"dynamicInputs": [],
"pricingOptionId": "0123456-d2e2-4604-b829-b3a80c3d6ccc",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"ppw": 0.1,
"name": "Travel Adder",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 360,
"uniqueKey": "0123456-259f-4f81-ab3b-6e83cb8a7c59",
"displayName": "Travel Adder",
"dynamicInputs": [],
"pricingOptionId": "0123456-eee4-4b21-959e-a9055f4e6368",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-f398-4f5b-a749-f3157eaefcd8",
"name": "Storage Packages 15kw ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 25000,
"uniqueKey": "0123456-f398-4f5b-a749-f3157eaefcd8",
"displayName": "Storage Packages 15kw ",
"dynamicInputs": [],
"pricingOptionId": "0123456-8dca-44fd-9f20-c0688d989683",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-a5ae-4862-9585-c9349ba563f7",
"name": "Margin ",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 150,
"uniqueKey": "0123456-a5ae-4862-9585-c9349ba563f7",
"displayName": "Margin ",
"fieldInputs": {
"what-is-the-margin-cost": 150
},
"dynamicInputs": [
{
"name": "what-is-the-margin-cost",
"type": "NumberField",
"settings": {
"label": "What is the margin cost?",
"isRequired": true
}
}
],
"pricingOptionId": "0123456-e94b-4118-9a0d-eb3495edbdd1",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
},
{
"id": "0123456-573c-406c-8070-aec4f63f989b",
"name": "MPU",
"orgId": "0123456-07a6-414f-97fe-0a918d6e2d08",
"amount": 10000,
"uniqueKey": "0123456-573c-406c-8070-aec4f63f989b",
"displayName": "MPU",
"dynamicInputs": [],
"pricingOptionId": "0123456-98d9-4126-8996-3dd0f5a99d30",
"pricingOptionName": "Pricing Option",
"dynamicInputsSatisfied": true
}
],
"baseCostWithSystemAddersAndDealerFees": 11300,
"equipmentAndValueAddersWithDealerFees": 38650,
"baseCostWithSystemAddersEquipmentAndDealerFees": 11840
},
"enerfloV2deal": {
"hasDesign": true,
"credit-score": "above-680",
"financingStatus": "approved",
"selectedProposal": "0123456-b9d3-4944-b8b6-fd492cecc316",
"financing-warning": true,
"hasApprovedDesign": true,
"hasReceivedDesign": true,
"hasSignedContract": true,
"hasCreatedProposal": true,
"hasApprovedContract": true,
"signedContractFiles": [
{
"name": "executed_contract.pdf",
"externalUrl": "https://assets.enerflo.io/docflo_pdfs/executed/Testing.pdf"
},
{
"name": "test-addendum.pdf",
"externalUrl": "https://assets.enerflo.io/docflo_pdfs/executed/test.pdf"
},
{
"name": "utah-ut-rocky-mt-power.pdf",
"externalUrl": "https://assets.enerflo.io/docflo_pdfs/executed/132.pdf"
},
{
"name": "rocky-mountain-power-utah-uh-net-metering-agreement.pdf",
"externalUrl": "https://assets.enerflo.io/docflo_pdfs/executed/123.pdf"
},
{
"name": "rocky-mountain-power-utah-ut-interconnection-agreement.pdf",
"externalUrl": "https://assets.enerflo.io/docflo_pdfs/executed/987.pdf"
}
],
"hasGeneratedContract": true,
"hasSignedFinancingDocs": true,
"contractApprovalEnabled": true,
"hasSubmittedFinancingApplication": true,
"all-decision-makers-present-at-time-of-appointment": true
},
"enerfloV2files": [
{
"url": "https://assets.enerflo.io/docflo_pdfs/executed/Testing.pdf",
"name": "executed_contract.pdf",
"source": "signedContractFiles",
"isPublic": true
},
{
"url": "https://assets.enerflo.io/docflo_pdfs/executed/test.pdf",
"name": "test-addendum.pdf",
"source": "signedContractFiles",
"isPublic": true
},
{
"url": "https://assets.enerflo.io/docflo_pdfs/executed/123.pdf",
"name": "utah-ut-rocky-mt-power.pdf",
"source": "signedContractFiles",
"isPublic": true
},
{
"url": "https://assets.enerflo.io/docflo_pdfs/executed/123.pdf",
"name": "rocky-mountain-power-utah-uh-net-metering-agreement.pdf",
"source": "signedContractFiles",
"isPublic": true
},
{
"url": "https://assets.enerflo.io/docflo_pdfs/executed/456.pdf",
"name": "rocky-mountain-power-utah-ut-interconnection-agreement.pdf",
"source": "signedContractFiles",
"isPublic": true
}
]
},
"progress": 0,
"files": [],
"enerflo_url": "https://enerflo.io/survey/menu/00000",
"solarData": {
"system_size": 3.6,
"system_cost": 10800,
"system_production": 5272,
"system_adder_cost": 39150,
"total_system_cost": 49950,
"total_base_cost": 10800,
"panel": {
"id": 0000,
"company_id": 0001,
"name": "Enphase: Q.PEAK DUO BLK-G10 + 360",
"model": "Q.PEAK DUO BLK-G10 + 360",
"manufacturer": "Enphase",
"width": 1045,
"length": 1879,
"watts": 360,
"meta_data": null,
"solar_degradation": 0.005,
"spec_sheet_url": null,
"created_at": "2024-03-20 20:05:05",
"updated_at": "2024-03-20 20:05:05",
"all_offices": 1,
"all_markets": 1,
"all_dealers": 0,
"all_lenders": 1,
"active": 1,
"price_adder": null,
"crm_id": null,
"price_cost": null
},
"inverter": {
"id": 0000,
"company_id": 0001,
"name": "Sol-Ark: Sol-Ark-12K-P",
"model": "Sol-Ark-12K-P",
"manufacturer": "Sol-Ark",
"meta_data": null,
"max_efficiency": 0.96,
"created_at": "2024-03-20 20:05:05",
"updated_at": "2024-03-20 20:05:05",
"is_microinverter": 0,
"all_offices": 1,
"all_markets": 1,
"all_dealers": 0,
"all_lenders": 1,
"active": 1,
"price_adder": null,
"fixed_cost": "0.00",
"crm_id": null
},
"inverter_count": 1,
"total_loan_cost": 49950,
"ppw": 13.88,
"ppw_net": 5.55,
"fed_tax_rebate": 14985,
"rebates": [],
"net_cost": 19980,
"finance_method": "Cash",
"finance_code": "Cash_0yr_0",
"finance_details": {
"apr": 0,
"term": 0,
"balance": 49950,
"termYears": 0,
"totalinterest": -49950,
"monthlypayment": 0,
"monthlypaymentInitial": 0,
"monthlypaymentAdjusted": 0,
"monthlypaymentEscalated": 0
},
"finance_ppw": 5.55,
"panel_type": false,
"down_payment": null,
"adders": {
"Small System Adder (under 5kW)": {
"id": 0000,
"qty": 1,
"cost": 500,
"name": "Small System Adder (under 5kW)",
"type": "SYSTEM",
"active": 1,
"base_cost": 500,
"company_cost": 0,
"offset_value": 0,
"single_price": 500,
"costAfterFees": 500,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Concierge Fee": {
"id": 0000,
"qty": 1,
"cost": 100,
"name": "Concierge Fee",
"type": "VALUE",
"active": 1,
"base_cost": 100,
"company_cost": 0,
"offset_value": 0,
"single_price": 100,
"costAfterFees": 100,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"EV Charger ": {
"id": 0000,
"qty": 1,
"cost": 2500,
"name": "EV Charger ",
"type": "VALUE",
"active": 1,
"base_cost": 2500,
"company_cost": 0,
"offset_value": 0,
"single_price": 2500,
"costAfterFees": 2500,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Travel Adder": {
"id": 0000,
"qty": 1,
"cost": 360,
"name": "Travel Adder",
"type": "VALUE",
"active": 1,
"base_cost": 360,
"company_cost": 0,
"offset_value": 0,
"single_price": 360,
"costAfterFees": 360,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Storage Packages 15kw ": {
"id": 0000,
"qty": 1,
"cost": 25000,
"name": "Storage Packages 15kw ",
"type": "VALUE",
"active": 1,
"base_cost": 25000,
"company_cost": 0,
"offset_value": 0,
"single_price": 25000,
"costAfterFees": 25000,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"Margin ": {
"id": 0000,
"qty": 1,
"cost": 150,
"name": "Margin ",
"type": "VALUE",
"active": 1,
"base_cost": 150,
"company_cost": 0,
"offset_value": 0,
"single_price": 150,
"costAfterFees": 150,
"contract_hide_adder": null,
"contract_show_adder_price": null
},
"MPU": {
"id": 0000,
"qty": 1,
"cost": 10000,
"name": "MPU",
"type": "VALUE",
"active": 1,
"base_cost": 10000,
"company_cost": 0,
"offset_value": 0,
"single_price": 10000,
"costAfterFees": 10000,
"contract_hide_adder": null,
"contract_show_adder_price": null
}
}
}
},
"driveFolders": {
"Customer Root": {
"id": "132456",
"name": "Stakt.io Testing (123456)",
"url": "https://drive.google.com/drive/u/0/folders/123456"
},
"Project Intake": {
"id": "456123",
"name": "Project Intake",
"url": "https://drive.google.com/drive/u/0/folders/456132"
},
"Site Survey": {
"id": 987654",
"name": "Site Survey",
"url": "https://drive.google.com/drive/u/0/folders/987654"
}
},
"installAgreement": {
"id": 00000,
"survey_id": 00000,
"company_id": 0000,
"agent_id": 0000,
"agreement_status": "Completed",
"agreement_file": "https://assets.enerflo.io/docflo_pdfs/executed/Testing.pdf",
"sign_date": "08/07/2024 @6:46 pm",
"agreement_hash": "123456789abcd"
},
"current_milestone": {
"id": 123456,
"epc_milestone_id": 0000,
"epc_install_id": 0000,
"completed_on": null,
"created_at": "2024-09-05 20:24:41",
"updated_at": "2024-09-05 20:25:20",
"estimated_completion_date": null,
"start_date": null,
"assigned_user_id": null,
"meta_data": {
"log": [
{
"ts": "2024-09-05 20:24:41",
"data": {
"start_date": "2024-09-05",
"completed_on": null,
"estimated_completion_date": null
},
"updated_user_id": 2
},
{
"ts": "2024-09-05 20:25:20",
"data": {
"start_date": null,
"completed_on": null,
"estimated_completion_date": null
},
"updated_user_id": 2
}
]
},
"completed_by": null,
"milestone": {
"id": 0000,
"epc_company_id": 0000,
"sequence": 5,
"title": "Interconnection",
"description": null,
"mid": "e3ca42ef",
"notify_customer": 1,
"visible_customer": 1,
"sms_body": "test test ",
"email_body": "test email"
"email_from": null,
"meta_data": {
"estimate_days": null,
"additional_emails": [
""
],
"notify_assigned_user": "0",
"sms_body_assigned_user": null,
"list_as_project_manager": "1",
"email_body_assigned_user": "",
"email_from_assigned_user": null,
"email_subject_assigned_user": "Tasks",
"email_from_type_assigned_user": null
},
"assigned_user_id": null,
"created_at": "2023-06-16 13:43:27",
"updated_at": "2023-06-16 13:43:27",
"email_from_type": "projectmanager",
"deleted_at": null
}
},
"all_milestones": [
{
"id": 123456,
"mid": "123456",
"name": "Project Submission",
"sequence": 0,
"completed_on": "2024-08-08 00:47:28",
"estimated_completion_date": null,
"start_date": null,
"notify_customer": null,
"visible_customer": null
},
{
"id": 123456,
"mid": "123456",
"name": "Site Survey",
"sequence": 1,
"completed_on": null,
"estimated_completion_date": null,
"start_date": "2024-08-08 00:47:28",
"notify_customer": null,
"visible_customer": null
},
{
"id": 123456,
"mid": "123456",
"name": "Notice to Proceed",
"sequence": 3,
"completed_on": "2024-09-05 12:00:00",
"estimated_completion_date": null,
"start_date": "2024-09-04 12:00:00",
"notify_customer": null,
"visible_customer": null
},
{
"id": 123456,
"mid": "123456",
"name": "Project Intake",
"sequence": 2,
"completed_on": "2024-09-04 12:00:00",
"estimated_completion_date": null,
"start_date": null,
"notify_customer": null,
"visible_customer": null
},
{
"id": 123456,
"mid": "123456",
"name": "Engineering",
"sequence": 4,
"completed_on": null,
"estimated_completion_date": null,
"start_date": "2024-09-05 12:00:00",
"notify_customer": null,
"visible_customer": null
},
{
"id": 123456,
"mid": "123456",
"name": "Interconnection",
"sequence": 5,
"completed_on": null,
"estimated_completion_date": null,
"start_date": null,
"notify_customer": null,
"visible_customer": null
}
],
"customer": {
"company_id": 0000,
"office_id": null,
"creator_id": 0000,
"agent_id": 0000,
"setter_id": null,
"first_name": "Enerflo",
"last_name": "Testing",
"email": "[email protected]",
"mobile": "1234568900",
"secondary_first_name": "",
"secondary_last_name": "",
"secondary_mobile": "",
"secondary_email": "",
"address": "123 main Street",
"city": "Centerfield",
"state": "UT",
"zip": "84622",
"county": "Sanpete County",
"lat": "39.11932640",
"lng": "-111.82094637",
"timezone": "America/Denver",
"details": null,
"external_id": null,
"lead_source": "",
"meta_data": {
"class": "App\\Http\\Controllers\\CustomerController",
"method": "in_app",
"function": "addCustomer",
"nem_signer": null,
"mailing_zip": "84622",
"mailing_city": "Centerfield",
"nem_override": false,
"gmapsOverride": 1,
"mailing_state": "UT",
"has_valid_email": 1,
"mailing_address": "123 main Street",
"location_confirmed": true,
"primary_sms_supported": 0,
"invalidEmailNotificationSent": 0
},
"status_id": -1,
"lead_router_id": null,
"referral_id": null,
"deleted_at": null,
"language": "en_US",
"unit_number": null,
"initial_contact": 0,
"deleted_by": null,
"fullName": "Enerflo Testing",
"id": 2675028,
"created": "2024-08-07T21:57:27+00:00",
"updated": "2024-09-19T19:16:40+00:00",
"fullState": "Utah",
"fullAddress": "123 main Street Centerfield, UT 84622",
"status_name": null,
"created_by_name": "Enerflo Admin",
"created_by_email": "[email protected]",
"created_by_phone": "(123) 456-8900",
"creator": {
"first_name": "Enerflo",
"last_name": "Admin",
"email": "[email protected]",
"phone": "9096109082",
"timezone": "America/New_York",
"id": 66211
},
"integrations": {
"Enerflo V2": {
"EnerfloV2Customer": {
"integration_record_id": "123456-ec13-4b84-9335-37ca2d380aa0",
"record_type": "EnerfloV2Customer",
"enerflo_id": 123456,
"last_synced": "2024-08-07T21:57:27+00:00",
"updated_at": "2024-08-07T21:57:27+00:00",
"created_at": "2024-08-07T21:57:27+00:00"
}
}
},
"owner": {
"first_name": "Enerflo",
"last_name": "Admin",
"email": "[email protected]",
"valid_email": 1,
"phone": "9096109082",
"timezone": "America/New_York",
"is_active": 1,
"id": 0000,
"meta": {
"inactive": "0",
"intercom_id": "123456abcd",
"is_view_only": "0",
"allow_optimus": "1",
"valid_email_ts": "2024-08-31 23:45:17",
"has_valid_email": 1,
"can_create_customers": "1",
"primary_sms_supported": 0,
"can_create_manual_installs": "0",
"create_update_change_order": "0"
}
},
"company": {
"company_name": "enerflo Solar",
"company_phone": "1111111111",
"company_address": "321 main street",
"company_city": "Centerfield",
"company_state": "UT",
"company_zip": "84622",
"company_email": "[email protected]",
"company_timezone": "America/Denver"
},
"customer_notes": "",
"futureAppointments": [],
"customer_portal_url": "https://enerflo.io/us/1234",
"customer_google_drive_folder": "https://drive.google.com/drive/u/1/folders/123456",
"surveys": {
"enerflo Solar - Optimus V2 Deal": {
"name": "enerflo Solar - Optimus V2 Deal",
"type": "sales",
"id": 123456,
"install": {
"id": 123456,
"status": null,
"created_at": 4428969,
"updated_at": 4428969
}
}
},
"loan_application_details": {
"lender": "N/A",
"application_status": "N/A",
"application_date": "N/A"
}
},
"change_orders": [
{
"id": 123456,
"epc_install_id": 123456,
"creator_id": 1234,
"change_values": {
"adders": {
"new": {
"123": {
"id": 123,
"cost": 300,
"name": "Customer Concierge Fee",
"active": false,
"quantity": 1,
"ignore_cost": 0,
"starting_cost": 300
},
"456": {
"id": 456,
"cost": 10000,
"name": "MPU",
"active": false,
"quantity": 1,
"ignore_cost": 0,
"starting_cost": 10000
},
"789": {
"id": 789,
"cost": 150,
"name": "Margin ",
"active": false,
"quantity": 1,
"ignore_cost": 0,
"starting_cost": 150
}
},
"old": {
"123": {
"id": 123,
"cost": 300,
"name": "Customer Concierge Fee",
"active": true,
"quantity": 1
},
"456": {
"id": 456,
"cost": 10000,
"name": "MPU",
"active": true,
"quantity": 1
},
"789": {
"id": 789,
"cost": 150,
"name": "Margin ",
"active": true,
"quantity": 1
}
}
},
"net_ppw": {
"new": 3.169,
"old": 3.15
},
"base_ppw": {
"new": 3.169,
"old": 3.15
},
"inverter": {
"new": 2584,
"old": 1894
},
"gross_ppw": {
"new": 3.63,
"old": 13.71
},
"itc_total": {
"new": 5883.78,
"old": 15014.25
},
"dealer_fees": {
"new": 0,
"old": 0
},
"panel_count": {
"new": 15,
"old": 10
},
"system_cost": {
"new": 19612.6,
"old": 50047.5
},
"system_size": {
"new": 5.4,
"old": 3.65
},
"adders_total": {
"new": 2500,
"old": 38550
},
"rebates_total": {
"new": 0,
"old": 0
},
"ppw_base_start": {
"new": 3.169,
"old": 3.15
},
"base_system_cost": {
"new": 17112.6,
"old": 11497.5
}
},
"signer": {
"email": "[email protected]",
"phone": "1234568900",
"last_name": "Testing",
"first_name": "Enerflo"
},
"co_signer": null,
"docflo_data": {
"documents": {
"template--change-order": "https://assets.enerflo.io/docflo_pdfs/executed/123.pdf"
},
"signer_id": "1234567899876543210",
"package_id": "123-f328-4a4e-90eb-4c5d87d059f4",
"cosigner_id": null,
"document_id": "123456-2296-4ad8-ac8c-bd0de733fac4",
"epcsigner_id": null,
"nemsigner_id": null,
"countersigner_id": "1234567899876543120123456789"
},
"pdf_url": "https://assets.enerflo.io/docflo_pdfs/executed/Testing.pdf",
"hash": "123456789987654321",
"created_at": "2024-09-19 19:16:29",
"updated_at": "2024-09-19 19:16:40",
"deleted_at": null,
"status": "complete",
"signed_at": "2024-09-19 19:16:40",
"notes": null,
"update_nem_docs": 0,
"nem_signer": null,
"is_override": 0
}
],
"company": {
"id": 123456,
"user_id": null,
"company_name": "Enerflo Solar",
"slug": "enerflosolar",
"company_phone": "1111111111",
"sms_number": null,
"sms_routing_number": null,
"company_address": "321 main St",
"company_city": "Centerfield",
"company_state": "UT",
"company_zip": "84622",
"company_email": "[email protected]",
"lat": "39.12286090",
"lng": "-111.82261080",
"timezone": "America/Denver",
"company_url": "",
"company_logo": "https://assets.enerflo.io/assets/clients/enerflosolar/enerflo.png",
"created_at": "2023-06-16 13:43:25",
"updated_at": "2024-07-09 16:10:44",
"v2_org_id": null,
"toll_free_number": null,
"toll_free_sid": null,
"old_sms_number": null,
"teamData": {
"crmId": null,
"ppwChanges": "1",
"requestDelay": null,
"epc_financing": "1",
"enerfloDesigns": "2",
"revisionFields": null,
"accessProposals": null,
"designProposals": "1",
"state_overrides": null,
"survey_type_ids": [
"0000"
],
"ccEnerfloRequest": null,
"chatNotifications": null,
"showSolarDesignUser": "0",
"disable_adder_pricing": null,
"disableEpcUserCloaking": null,
"proposalRequestSectionIds": [
"0000"
],
"sales_org_project_settings": null,
"disable_milestone_notification": null,
"allow_sales_to_approve_contracts": null
}
},
"agent": {
"id": 0000,
"user_id": 0000,
"company_id": 000,
"manager_id": 0,
"project_manager_id": 0,
"created_at": "2023-07-14 18:17:16",
"updated_at": "2023-07-14 18:17:16",
"deleted_at": null,
"user": {
"id": 0000,
"first_name": "Enerflo",
"last_name": "Admin",
"email": "[email protected]",
"valid_email": 1,
"phone": "9096109082",
"user_type": "",
"meta_data": {
"inactive": "0",
"intercom_id": "0123456",
"is_view_only": "0",
"allow_optimus": "1",
"valid_email_ts": "2024-08-31 23:45:17",
"has_valid_email": 1,
"can_create_customers": "1",
"primary_sms_supported": 0,
"can_create_manual_installs": "0",
"create_update_change_order": "0"
},
"timezone": "America/New_York",
"force_logout": 0,
"created_at": "2023-06-16 13:43:27",
"updated_at": "2024-08-31 23:45:17",
"deleted_at": null,
"invite_expires": null,
"invite_token": null,
"is_active": 1,
"intercom_hash": "0123456789876543210"
}
},
"milestones": [
{
"id": 0000,
"epc_milestone_id": 0000,
"epc_install_id": 0000,
"completed_on": "2024-08-08 00:47:28",
"created_at": "2024-08-07 23:59:44",
"updated_at": "2024-08-08 00:47:28",
"estimated_completion_date": null,
"start_date": null,
"assigned_user_id": null,
"meta_data": null,
"completed_by": null,
"milestone": {
"id": 000,
"epc_company_id": 000,
"sequence": 0,
"title": "Project Submission",
"description": "Project Submitted",
"mid": "0000",
"notify_customer": 0,
"visible_customer": 0,
"sms_body": null,
"email_body": "",
"email_subject": null,
"email_from": null,
"meta_data": {
"estimate_days": null,
"additional_emails": [
""
],
"notify_assigned_user": "0",
"sms_body_assigned_user": null,
"list_as_project_manager": "0",
"email_body_assigned_user": "email",
"email_from_assigned_user": null,
"email_subject_assigned_user": "Welcome to {{company_name}},{{customer_name}}!",
"email_from_type_assigned_user": null
},
"assigned_user_id": null,
"created_at": "2023-06-16 13:43:27",
"updated_at": "2023-06-16 13:43:27",
"email_from_type": "agent",
"deleted_at": null
}
},
{
"id": 0123456,
"epc_milestone_id": 0000,
"epc_install_id": 0000,
"completed_on": null,
"created_at": "2024-08-07 23:59:44",
"updated_at": "2024-08-08 00:47:28",
"estimated_completion_date": null,
"start_date": "2024-08-08 00:47:28",
"assigned_user_id": null,
"meta_data": null,
"completed_by": null,
"milestone": {
"id": 0000,
"epc_company_id": 0000,
"sequence": 1,
"title": "Site Survey",
"description": "Structural and Electrical Inspection",
"mid": "0000",
"notify_customer": 1,
"visible_customer": 1,
"sms_body": "",
"email_body": "email",
"email_subject": "{{company_name}} Site Survey Reserved with {{assigned_user_full_name}}",
"email_from": null,
"meta_data": {
"estimate_days": null,
"additional_emails": [
""
],
"notify_assigned_user": "1",
"sms_body_assigned_user": null,
"list_as_project_manager": "1",
"email_body_assigned_user": "",
"email_from_assigned_user": null,
"email_subject_assigned_user": "Creat Task",
"email_from_type_assigned_user": null
},
"assigned_user_id": null,
"created_at": "2023-06-16 13:43:27",
"updated_at": "2023-06-16 13:43:27",
"email_from_type": "projectmanager",
"deleted_at": null
}
},
]
},
"signer": {
"email": "[email protected]",
"phone": "1234568900",
"last_name": "Testing",
"first_name": "Enerflo"
},
"co_signer": [],
"notes": null,
"change_values": {
"adders": {
"new": {
"123": {
"id": 123,
"cost": 300,
"name": "Customer Concierge Fee",
"active": false,
"quantity": 1,
"ignore_cost": 0,
"starting_cost": 300
},
"456": {
"id": 456,
"cost": 10000,
"name": "MPU",
"active": false,
"quantity": 1,
"ignore_cost": 0,
"starting_cost": 10000
},
"789": {
"id": 789,
"cost": 150,
"name": "Margin ",
"active": false,
"quantity": 1,
"ignore_cost": 0,
"starting_cost": 150
}
},
"old": {
"123": {
"id": 123,
"cost": 300,
"name": "Customer Concierge Fee",
"active": true,
"quantity": 1
},
"456": {
"id": 456,
"cost": 10000,
"name": "MPU",
"active": true,
"quantity": 1
},
"789": {
"id": 789,
"cost": 150,
"name": "Margin ",
"active": true,
"quantity": 1
}
}
},
"net_ppw": {
"new": 3.169,
"old": 3.15
},
"base_ppw": {
"new": 3.169,
"old": 3.15
},
"inverter": {
"new": 2584,
"old": 1894
},
"gross_ppw": {
"new": 3.63,
"old": 13.71
},
"itc_total": {
"new": 5883.78,
"old": 15014.25
},
"dealer_fees": {
"new": 0,
"old": 0
},
"panel_count": {
"new": 15,
"old": 10
},
"system_cost": {
"new": 19612.6,
"old": 50047.5
},
"system_size": {
"new": 5.4,
"old": 3.65
},
"adders_total": {
"new": 2500,
"old": 38550
},
"rebates_total": {
"new": 0,
"old": 0
},
"ppw_base_start": {
"new": 3.169,
"old": 3.15
},
"base_system_cost": {
"new": 17112.6,
"old": 11497.5
}
},
"created_at": "2024-09-19T13:16:29-06:00",
"updated_at": "2024-09-19T13:16:40-06:00",
"signed_at": "2024-09-19T13:16:40-06:00",
"pdf_url": "https://assets.enerflo.io/docflo_pdfs/executed/Testing.pdf",
"eventName": "signed_change_order"
}Updated over 1 year ago
Did this page help you?
